The surplus arbiter

How Sowel decides, every ten seconds, which of your appliances deserves the solar surplus, and why one referee beats four clever automations.


Part 1: What it does for you

The problem it solves

A house with solar panels and a few big flexible loads (a pool pump, a water heater, one or two heat pumps) faces the same question all day long: there is spare solar power right now; who should get it?

The naive answer is to give each appliance its own "run on solar" automation. It fails in a predictable way: every automation sees the same surplus and claims it at the same time. Three loads switch on for 800 W of spare power, the house starts importing, all three automations see the import and switch off, the surplus reappears, and the cycle starts again. Each automation is locally right and the house is globally wrong.

Sowel's answer is a single referee: the surplus arbiter. Automations don't switch loads on solar anymore: they ask for capacity. The arbiter knows the one true surplus, your priority order, and what every load actually draws, and it grants or revokes capacity one decision at a time. Recipes request; you own the order.

What you see

The Energy › Live page answers "who has the surplus right now, and why" at a glance:

The surplus arbitration card: current states, the day's timeline, and the decision journal

Three layers, top to bottom:

  • The state table: each flexible load with its live state (Granted, Granted (not consuming), Waiting, At rest), what it asked for, what it actually draws, and how much grid import it is allowed to tolerate. The table and the ribbon use the same word for the same state: they are two views of one reading, not two readings.
  • The timeline: the day in 15-minute slots per load, against the surplus/deficit curve. You can see the pool pump picking up the morning surplus, the water heater joining at noon, the pool heat pump waiting its turn. The solid green says the load actually consumed the surplus it was granted; a lighter green says it held the grant and its own power measurement shows nothing — a water heater whose breaker was left open, a pump that never started. A load with no power measurement used to stay solid green, on the principle that Sowel does not display what it does not know. Since spec 166 the recipe holding the grant can say whether its load actually needs current, so an unmetered load that declares it needs nothing is drawn as not consuming too. A measurement, when there is one, always overrules the declaration.
  • The decision journal: every grant and revoke, timestamped, in plain words. When you wonder "why did the heat pump stop at 15:04", the answer is written there.

What you configure

Three touchpoints, in increasing order of "you will probably never need this":

1. Declare a flexible load. On the equipment page, tick Flexible load and give the nominal power. That's the whole entry ticket:

The per-equipment energy profile

2. Order your priorities. In Settings › Energy, drag your loads into the order that matches your life. The top load gets the surplus first; the bottom one is shed first. This list is the single most important decision you make, and it is yours, not an algorithm's:

The arbiter settings: priority order and advanced thresholds

3. Advanced thresholds. Seven knobs with sensible defaults, explained in Part 2. Most installations never touch them.

The behaviors you get for free

  • Your hand always wins. Switch a load on or off manually and the arbiter steps aside for that load for two hours, then quietly resumes. It never fights you.
  • No short-cycling. A granted load runs a minimum duration before it can be revoked, and rests a minimum duration before it can be re-granted. Compressors and pump seals are expensive; ping-ponging them to chase clouds is not optimization.
  • Real power, not declared power. The arbiter learns what each load actually draws across its runs and budgets with the measured figure, so a pump declared at 600 W that really pulls 650 W doesn't silently push the house into import.
  • It fails safe. If the grid meter goes silent, the arbiter stops granting. If a load's real state contradicts its decision, because someone used the wall switch, it backs off rather than fighting the wall. The timeline says so in its own colour, manual control: a load the arbiter has stepped aside from is not the same thing as a load simply running outside arbitration, and only the first one clears with "resume control now".

Part 2: How it works, precisely

This section documents the actual algorithm and every setting, with the design decisions and their reasons. Feature history: specs 140 (core arbiter), 148 (timeline), 158 (baseline metrics), 164 (granted-but-idle), 165 (one load state model), 166 (claimant-declared need) in the specs index.

Architecture

One CapacityArbiter runs in the Sowel engine. Recipes and equipment-level automations never command "on because solar" directly; they submit a capacity request (load, wanted watts). The arbiter owns the whole decide-act loop:

grid meter ──► smoothed surplus ──► decision loop ──► grant / revoke ──► orders
   requests (recipes, profiles) ────────┘

Decisions are events on the engine bus, persisted to the timeline store, pushed to the UI over WebSocket, and journaled. The Live card is a pure read model: everything it shows is what the arbiter actually did, not a parallel estimate.

What "surplus" means: one number, measured

The arbiter's surplus is the signed grid exchange measured at the main meter: positive when exporting, negative when importing. It is deliberately not "production minus consumption" computed from separate meters (two meters drift; per-minute clamping makes their difference lie), and the user-facing surplus everywhere in Sowel (the pill, the curve, the recipe API) is this same measured number. Internal reservation accounting (how much of the surplus is already promised to granted loads) exists but is never displayed as "surplus": showing the residual made the pill contradict the meter on the wall, and the meter wins.

The decision loop

Every meter tick, the arbiter:

  1. Smooths the surplus over a sliding window (Meter smoothing, default 60 s). Raw home meters flicker by hundreds of watts; granting on a flicker means revoking on the next one.
  2. Grants the highest-priority waiting load if the smoothed surplus has stayed above the load's effective need plus the engage margin (default 100 W) for the engage hold (default 120 s). Effective need is three-tier: the load's fresh live draw when it is running, else the learned power the arbiter has measured across past runs, else the declared nominal power.
  3. Revokes the lowest-priority granted load if the deficit has persisted beyond the load's tolerated import for the release hold (default 600 s). The asymmetry is intentional: joining late is cheap, quitting early costs a compressor start.
  4. Shields every granted load by its min run and every idle load by its min rest: anti-short-cycle floors that outrank the surplus arithmetic. A cloud that lasts less than the release hold plus the min-run shield simply never reaches the hardware.

Priority is strict and yours: the list in Settings, top first for grants, bottom first for sheds. Two load classes refine what a grant means: a deferrable load (pool pump, water heater) is switched on and off outright; a comfort load (a heat pump already running for the household) is never switched off by the arbiter: a grant only boosts it, and a revoke returns it to its normal setpoint.

Every setting, documented

Per load (equipment page › Energy management):

Setting Default What it does
Flexible load off Enrolls the equipment. Enabling changes nothing until the arbiter itself is on.
Nominal power (W) none The budget used until enough runs exist to learn the real draw. Required.
Tolerated import (W) 0 How much grid import this load may ride through before the deficit clock starts. Non-zero for loads whose duty cycle dips (heat-pump compressors) or that must finish what they started (a pool pump running its UV lamp).
Min run (min) 0 Once granted, the load runs at least this long. Anti-short-cycle floor; also the knob that guarantees a minimum useful run (a pool pump that must filter 45 min to be worth starting).
Min rest (min) 0 Once revoked, the load rests at least this long before the next grant.
Shutdown delay (min) global How long the load keeps drawing after a revoke before it actually stops, e.g. a thermodynamic water heater's 30-minute tail. The arbiter keeps budgeting that power instead of double-allocating it.

Global (Settings › Energy › Surplus arbiter › Advanced thresholds):

Setting Default What it does
Engage margin (W) 100 Safety reserve kept before granting more capacity. Higher = later grants, less import.
Engage hold (s) 120 How long the surplus must persist before a grant. Higher = brief sun spikes ignored.
Release hold (s) 600 How long the deficit must persist before a revoke. Higher = fewer on/off cycles.
Meter smoothing (s) 60 Averaging window on the meter reading. Higher = less noise, slower reaction.
Manual override (s) 7200 How long a manual action pauses the arbiter for that load before automatic resumption.
Meter stale after (s) 300 If the meter stays silent this long, readings are considered stale and granting stops. Fail-safe: no data, no promises.
Switch confirmation (s) 60 How long a load's real state must contradict the arbiter's decision before it steps aside. The wall-switch detector.

Failure modes and their answers

  • Meter silencestale after stops all granting; granted loads keep their state rather than being blind-revoked.
  • A human at the wall switchswitch confirmation detects sustained divergence between decision and reality and suspends arbitration for that load; the journal says so. A suspension answers that event, not the standing state it leaves behind: a load left running outside arbitration earns one suspension, and the same unchanged state never arms another. Otherwise the manual-override delay expired into an identical suspension a minute later, for ever, and the load could never be taken back — "resume control now" included, which was undone 62 s after every press. A claim waiting on that load changes nothing: a recipe claiming through the whole solar day would otherwise leave a load somebody switched on unprotected for the day, and the arbiter would revoke it out from under them on the first deficit. The protection is deferred by one delay, never removed. Once it lapses the load is journaled as running outside arbitration, so the timeline and the day report say what it is actually doing instead of calling it idle.
  • The load that lies about its power → learned power replaces the declaration after a few runs (the profile card shows "Measured: N W over K runs").
  • The 15:00 flapping band, surplus hovering exactly around one load's need, is damped three times over: smoothing flattens the noise, holds demand persistence, min-run/min-rest floor the cycle length.

What it deliberately does not do

No price optimization, no forecasting in the loop, no machine-learned priorities. The arbiter is a referee, not a trader: it makes the household's stated order true against the measured surplus, and every decision it takes can be read back in one line of the journal. Predictive scheduling on top of it (pre-heating before a cloudy afternoon, tariff-aware deferral) is a separate, measured roadmap, with this arbiter's decision journal as its baseline.